Skip to content
3716 E. Thomas Road, Phoenix, Arizona 85018Monday – Friday: 6 a.m. – 3 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 6 a.m. – 3 p.m.Residential contractor · AZ ROC # 000000VerifyLead-Safe Certified Firm (RRP) · US Firm cert. # 000000VerifyGeneral liability and workers' compensation
2 more licenses
  • Residential contractor · AZ ROC # 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Firm cert. # 000000Verify
  • General liability and workers' compensation
(602) 555-0104

What we do

Six fixes, one ranch house at a time

Each page says what is included, what changes the cost and how a job typically goes. Two of them often go together.

  • Open the kitchen wall

    Take out the wall between the kitchen and the living room, with the engineer's letter, the beam and the permit.

    See the details
  • Add a primary bath

    A bath off the main bedroom, with the drain cut through the slab and a fan vented outside.

    See the details
  • Carport to room

    Close in the carport with insulated walls, cooling and a window, and match the front of the house.

    See the details
  • Arizona room

    Enclose the covered patio with glass and cooling, so it is a room you can use in July.

    See the details
  • Floors over the slab

    Tile or plank over the slab, leveled, with cracks bridged and one floor run through the rooms.

    See the details
  • Ceilings, lights and fans

    Tested, smoothed ceilings and lights placed where you sit, under an electrical permit.

    See the details

Good to know

What we do and don't do

What don't you do?

We don't build new houses, pools or second stories, and we don't do roofs, landscaping or pest work. If your job needs one of those, we say so at the walk-through and point you to someone who does.

Who will be working in my house?

Our crew does the framing, finish carpentry and tile. Plumbing, electrical and cooling work is done by licensed trades we work with, and they are listed on the estimate.

How long does a job take?

It depends on the fix and on the city's permit queue. As a rough guide, a floor or a ceiling is a matter of days to a couple of weeks. A bath or a kitchen wall is a few weeks on site after plans and permit, and a carport or an Arizona room is several. Your written schedule sets yours.

Which of the six is yours?

Text a photo of the front of the house and the room that bothers you. We write back with where to start.