Skip to content
3716 E. Thomas Road, Phoenix, Arizona 85018Monday – Friday: 6 a.m. – 3 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 6 a.m. – 3 p.m.Residential contractor · AZ ROC # 000000VerifyLead-Safe Certified Firm (RRP) · US Firm cert. # 000000VerifyGeneral liability and workers' compensation
2 more licenses
  • Residential contractor · AZ ROC # 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Firm cert. # 000000Verify
  • General liability and workers' compensation
(602) 555-0104

Fix 5 of 6

New floors over a concrete slab

Most ranch houses were built on a slab, with carpet or vinyl on top. A new floor, run from room to room, does more for the house than almost anything else, and it can be done without moving a wall.

A slab has to be right before anything goes on it. We pull the old floor, grind off the glue, check for cracks and low spots, and level where needed. Cracks get a flexible membrane so they don't show through tile. Then the tile or wood-look plank goes down in one pattern through the rooms, with thresholds and baseboards done to match. Floor tile and vinyl from before the 1980s are tested before they are touched.

What the job includes

  • Old flooring removed and hauled away

  • The slab cleaned, ground and leveled

  • A flexible membrane over cracks

  • Tile or wood-look plank set in one run

  • Baseboards, thresholds and door trim fitted

  • A lab test on old floor tile or glue before it is disturbed

A gloved hand setting tile leveling clips with pliers on a thinset floor

What changes the cost

What moves the cost of a new floor

No figures here: the number comes after the walk-through. These four things decide it.

  • How flat the slab is

    A slab that is flat needs little. One with dips and humps needs leveling compound, and a lot of it adds up.

  • The material and the pattern

    Large tile, small tile, plank, a diagonal pattern: each sets differently and wastes a different amount.

  • What is coming up

    Carpet is quick. Glued vinyl and old tile are slow, and they are tested before they are touched.

  • Doors, thresholds and baseboards

    A new floor is thicker than carpet. Doors are trimmed, thresholds are set and baseboards are redone to suit.

How it goes

How a new floor goes

Typical days, for planning. Your written schedule sets yours.

  1. 01
    Days 1 to 3

    Step 1: Test and prep

    If the old floor needs a test, the lab result comes first. Furniture is moved and the old floor comes up.

  2. 02
    Days 3 to 5

    Step 2: Level and membrane

    The slab is ground, cracks are bridged and low spots are filled.

  3. 03
    About a week

    Step 3: Set the floor

    Tile or plank goes down room by room, working back toward the door so you can still get out.

  4. 04
    Days after setting

    Step 4: Grout, trim and finish

    Grout, sealer, thresholds and baseboards, then the final walk. Furniture goes back after the grout cures.

Questions

Before you pick a fix

Can you tile over my old tile?

Sometimes. If the old tile is sound, flat and tests clear, it can stay. It raises the floor and can leave a step at doors, so we decide at the walk-through.

Will the cracks in my slab come through?

Not if they are dealt with first. A flexible membrane goes over them before the tile, so a small movement in the slab doesn't crack the tile above it.

How soon can we walk on it?

About a day for the tile. Furniture goes back a few days later, once the grout and sealer have cured. Your schedule gives the exact days.